Istruzioni instructions
Preliminary checks
•
Check that the gate structure is sufficiently sturdy and there are no points of friction.
•
Make sure the gate hinges are working properly and adequately lubricated.
•
Check there are mechanical stops in closing and opening
Installing the foundation box (Fig. 1)
•
Prepare a suitable hole to house the foundation box (a).
•
Lay a pipe for the cables by the hole in the foundation box (b).
•
Prepare a pipe for draining water (b).
•
Sit the foundation box inside the hole, keeping to the measurements given in (c).
70
c)
a)
Instructions
Instrucciones Anleitungen
b)
fig. 1
13