STEINEL PROFESSIONAL HBS 200 Manual Del Usuario página 4

Ocultar thumbs Ver también para HBS 200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Wiring
Before installation, make sure that power has
been switched off at the breaker and check that
the circuit is dead with a voltage tester.
The leads consist of three wires:
Black = line
White = neutral
Red
= load
If in doubt, identify the individual conductors with
a voltage tester or contact a qualifi ed electrician.
Standard wiring for the HBS 300 and HBS 200 High Bay Occupancy Sensors
- 6 -
Operation
The HBS 300 and HBS 200 operate by turning
lights ON automatically when occupancy
is detected and OFF when the space is left
vacant and the time delay has elapsed.
Light level function
The light level (Hold OFF) feature keeps
lighting OFF during daylight hours, regardless
of occupancy.
Initial power up
Upon initial power up, the load will turn ON
for up to one minute. If no motion is detected,
the load will switch OFF. If motion is detected
and the target light level setting is less than
the daylight level, the load will stay ON for the
selected time delay setting (per DIP switch
setting). If the daylight level at power up is
greater than the target light level setting, the
load will switch OFF regardless of occupancy.
Surge protection
The surge protection feature will reset the
sensor automatically after: power surges,
power outages, and power shortages. Surge
protection protects the sensor if it is miswired
as well. If miswired, shut off power, correct
the wiring, and the sensor will then operate
correctly.
- 7 -

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hbs 300

Tabla de contenido