Pre-Installation; Planning Installation; Tools Required; Hardware Included - Husky 44602 Guía De Uso Y Mantenimiento

Estante mural de almacenamiento
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pre-Installation

PLANNING INSTALLATION

1. Decide where and how high you would like the storage rack installed. It must start and fi nish on studs.
Studs should be centered 48 in. apart in order to support 800 lbs.
NOTE: In order to support 800 lbs, your studs must be a
maximum of 48 in. apart.
2. Open the carton. Then lay out and organize parts.

TOOLS REQUIRED

Adjustable
wrench
Level

HARDWARE INCLUDED

AA
Part
Description
AA
Lag Bolt
BB
Large Bolt
CC
Medium Bolt
EE
Mushroom Head Screw
Large Nut
FF
GG
Medium Nut
II
Long Bolt *
KK
Large Washer
LL
Large Lock Washer
MM
Medium Washer
NN
Medium Lock Washer
* For use only if you have purchased multiple Wall Storage
Racks and want to connect them together.
Ratchet
Drill
BB
CC
EE
Quantity
6
10
11
3
13
11
3
10
10
11
11
Stud fi nder
Pencil
FF
GG
II
NOTE: Hardware shown not to scale.
II
3
Please contact 1-888-HD-HUSKY for further assistance.
Measuring
tape
KK
LL
MM
NN
HUSKYTOOLS.COM

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

1002332673

Tabla de contenido