Installation Instructions
Using the diagrams below to connect the pump hose to the dehumidifier. After installation, please ensure
the bucket is correctly placed in the dehumidifier. The bucket must be in place for proper operation.
Step 1: Remove the dehumidifier Bucket
Step 3: Secure the drainage joint onto the
continuous drainage connector
Step 5: Make sure the drain hose is securely
connected to the drainage joint by pushing
the large hose clamp towards the drainage
joint.
Step 2: Open the Drainage door on the side
of the dehumidifier
Step 4: Place the large 1M hose clamp
onto the drain hose and attach to the
drainage joint on the dehumidifier.
Step 6: Re-insert the bucket into the
dehumidifier for operation.
6