ALL Fostoria YES models require some assembly. Four steps are required to complete the assembly and installation.
Tools required: (2) ¾" socket or box wrenches.
Parts required: the two screws required to secure
wall/ceiling bracket to a suitable surface are not
supplied with heater. You must use 5/16" bolts and
flat washers to mount this bracket.
Hanger Assembly Detail
HANGER
FALLING OBJECTS HAZARD
FIRE HAZARD
CHUTES D'OBJETS LES RISQUES
RISQUE D'INCENDIE
Serious injury or death may occur.
Blessures graves ou la mort peuvent survenir.
Read and follow all safety information and
instructions in box below.
Lire et suivre toutes les consignes de
sécurité et les instructions dans la boîte ci-
dessous.
•
Mounting bracket supplied with YES models
MUST be used to support heater.
•
Installer MUST be certain surface that
bracket is mounted to will support 100 lbs of
weight continuously.
•
Rotating stops MUST be installed as shown
above.
•
Do not mount heater upside down (See
nameplate label for "TOP" of heater.)
•
The bottom of these units must be mounted at
least 6 ft. off the floor and the top 2 ft. from
the ceiling.
•
Do not suspend ANY other equipment from
this bracket. One heater per bracket
Issue Date: 4-19-02 Rev. Date: 03/14
YES - SERIES INSTALLATION
KNOB
Wall Mount Option #1
TOP
STOP
TOP
of
Heater
Rev. Level: 19
ECO1-6931
Step 1: Install (1) side rotating stop over
bolt and into curved slot (as shown at
right) on each side of heater.
Step 2: Assemble hanger to heater per hanger
assembly detail. No tools are required.
Step 3: Secure wall/ceiling mounting bracket to appropriate
surface that will support a min. weight of 100lbs continuously.
NOTE: all mounting hardware to mount hanger to wall/ceiling
bracket is supplied with heater.
Step 4: Assemble unit to mounting bracket following
instructions of chosen mounting option below.
ROTATING
TOP
of
Heater
OIPM P/N 8997
Ceiling Mount Option
TOP of
Heater
Wall Mount Option #2
Page 4 of 27