STEP 1
PASO 1
Parts and tools required to complete step
Piezas y herramientas necesarias para completar este paso
MM
M4 Allen Wrench (included)
Llave Allen M4 (incluido)
Attach Bottom Front Rail (Part G),
Bottom Back Rail (Part F), Top Front Rail
(Part E), (2)
Drawer Rails
Top Back Rail (Part D) to
C) using (6) 50mm bolts (Part MM),
(6)
Crescent Washer
(12) 30mm
Dowels (Part
the Bolts with the M4 Ballend Screw-
driver and M4 Allen wrench, following
the instructions on pages 14 and 15.
16
50mm Bolt x6
Perno 50mm
Φ6x30mm Dowel x12
KK
Pasador Φ6x30mm
(Part H) and
Left Side
(Part BB) and
KK).
Tighten
BB
M4 Ballend Screwdriver
destornillador M4 con cabeza de bola
Fije la
Barra frontal inferior
Barra trasero inferior
Frontal Superior (Pieza E), (2)
(Part
la gaveta
Superior (Pieza D) al
(Pieza C) utilizando (6) Pernos 50mm
(Pieza MM), (6)
luna
(Pieza BB) y (12)
(Pieza KK)
M4 con cabeza de bola y la llave Allen
M4 siguiendo las instrucciones de
laspáginas 14 y 15.
Crescent Washer x6
Arandela de media luna
(Pieza G),
(Pieza F), Barra
(Pieza H) y Barra Posterior
Lado izquierdo
Arandela de media
Pasadors
utilizando el destornillador
Barra de
30mm