Tripp-Lite SRWO12US El Manual Del Propietario página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation/Wall-Mounting
Step
Before mounting the rack, find the studs in your wall/
1
mounting surface and make all measurements, and or
guide marks in accordance with the mounting template
that is provided.
Step
Using user-supplied hardware, mount the top and bottom
2
Wall-Mount "A" Frames to the wall as shown in the
diagram. Both mounting frames can accommodate 5/16"
lag bolts.
2
Step
Attach the Equipment Mounting Frame to the top "A"
4
Frame, using the other t bolt, washer, pivot bearing and
locknut as shown in the diagram. To allow for variation
in the installed gap between the "A" Frames, additional
washers have been included that can be used in
conjunction with the pivot bearing to provide additional
spacing.
Note: The Equipment Mounting Frame should be tightened
to the 2 "A" Frames enough to provide a stable attachment
while also allowing for an easy swinging arc. This may take
a few adjustments that are recommended to be made
before trying to install equipment.
LOCKNUT
WASHER
PIVOT
BEARING
T BOLT
4
201012095 93-2993.indb 3
continued
Step
16"
(406.4 mm)
2.2"
(56.2 mm)
25.8125"
(656 mm)
(hole to hole)
2.2"
(56.2 mm)
Step
Step
(Optional)
3
Attach the Equipment Mounting Frame to the bottom "A"
3
Frame first, using the t bolt, washer, pivot bearing and
locknut as shown in the diagram.
T BOLT
PIVOT
BEARING
WASHER
LOCKNUT
3
Insert the two locking pins to stabilize the rack. You do
5
not want the rack to swing at all while installing
equipment.
5
A locking pin can also be inserted to lock the Equipment
6
Mounting Frame in the "Open" swing out position for cable
installation or equipment maintenance (see diagram).
6
12/28/2010 11:28:34 AM

Publicidad

Tabla de contenido
loading

Tabla de contenido