Allen + Roth PERGOLA Manual Del Usuario página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
5-3. Move the ferrule (O) to the middle of
assembled top arc beams (B1, B2),
secure with bolts (AA) and washers (BB),
tighten with wrench (ZZ) and cover bolts
with plastic caps (DD).
Hardware Used
M6 x 15 mm Short Bolt
AA
M6 Washer
BB
DD
M6 Plastic Cap
ZZ
M6 Wrench
6. Connect the assembled top arc beams
(B1, B2) with the beam decorations (G2)
through the holes of assembled top
beams (C1, C2) using bolts (HH),
washers (KK) and nuts (GG), tighten with
wrench (ZZ) and cover bolts with plastic
caps (DD).
Hardware Used
M6 SS Washer
KK
M6 SS Nut
GG
M6 x 56 mm SS
HH
Middle Bolt
DD
M6 Plastic Cap
ZZ
M6 Wrench
5-3
5-3
7-2
7-2
DD
AA
BB
x 4
B1
x 4
x 4
x 1
6
8
8
6
12-1
12-1
12-1
12-1
G2
DD
x 32
x 16
x 16
x 16
x 2
10
B2
O
KK
B2 B1
GG
KK
C1 C2
G1
HH

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

L-pg152pst-b0878763

Tabla de contenido