PYD Electrobombas MP Serie Manual De Instalación Y Mantenimiento página 20

Electrobomba centrífuga multicelular
Ocultar thumbs Ver también para MP Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTRUCTIONS MANUAL AND MAINTENANCE
SERIE MP
5. INSPECTION BEFORE STARTUP
Make sure that the mains voltage and frequency are the same as those on the specification plate.
Make sure the condenser matches the pump motor requirements (for single phase motors).
Make sure the pump is fully submerged (in the case of submersible pumps).
Check the direction of rotation.
Never run the pump dry.
Never modify the position of the level switch set by the manufacturer.
6. MAINTENANCE
Our pumps do not require specific maintenance, but the following operations are recommended:
In cold seasons, or when the ambient temperature is low, empty the discharge pipe to prevent
water from freezing inside.
If the pump is not going to be used for a long period of time, it should be cleaned and stored in a
dry place to avoid corrosion.
20
www.proindecsa.com / proindecsa@proindecsa.com

Publicidad

Tabla de contenido
loading

Tabla de contenido