Descargar Imprimir esta página
Flotec TC2120 Instrucciones De Funcionamiento E Instalación
Flotec TC2120 Instrucciones De Funcionamiento E Instalación

Flotec TC2120 Instrucciones De Funcionamiento E Instalación

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

P.O. Box 342, Delavan, WI 53115
Phone: 1-800-365-6832 • Fax: 1-800-526-3757
E-Mail: flotec@flotecpump.com • Web Site: http://www.flotecwater.com
6
7
6
Figure 1
HORIZONTAL TANK REPAIR PARTS LIST
Key
Part
No.
Description
1-5
Air Volume Control Kit
6
Clamp - Hose (2 Req.)
7
Hose
8
Elbow - 3/4" - Nylon*
8
Cross*
Note: Parts listed above are included with Models FP7210-00 and
FP7200-00.
Hazardous pressure. To avoid tank explosion
and possible serious or fatal injury, system pressure must not
exceed 75 PSI (517kPa) and pump, tank, and piping system
must not freeze.
Install relief valve capable of passing full pump flow at 75 PSI
(517kPa).
Allowing tank or system to freeze when full of water voids war-
ranty.
INSTALLATION INSTRUCTIONS
HORIZONTAL TANKS
NOTICE: When installing hose, use only water as lubricant.
Tank and fittings kit contains necessary fittings to attach pump to
tank. Before installing or servicing tank, disconnect power to pump
and release all pressure in tank and system.
For proper installation:
1. Using teflon tape on threads, screw plastic elbow (Key No. 8)
into side discharge port of pump. DO NOT use pipe joint com-
pound on threads – it can damage plastics.
2. Set pump on tank bracket. DO NOT bolt down.
3. Hold hose (Key 7) along side standpipe in tank and plastic elbow
in pump. Measure length from bottom of standpipe to plastic
elbow 1/2" (12mm) above bayonet grooves. Mark and cut with
sharp knife.
4. Remove pump from tank bracket and install hose on elbow. Use
only water as lubricant.
5. Place two hose clamps on hose.
6. Install bolts in tank bracket, coming up from below bracket;
wedge bolts in place so that square portion of bolt head engages
slot.
®
Priming Plug
8
(User Supplied)
To
Service
1
2
5
155 0893
4
3
Part
Number
TC2120
U19-55SS
U74-37H
U78-770P
U78-961P
(FIG. 1)
For further operating, installation, or maintenance assistance:
Call 1-800-365-6832
Epoxy-lined Tanks
OPERATING & INSTALLATION INSTRUCTIONS
NOTICE: To give sufficient clamping surface with cast iron
pumps having 2-3/4" bolt hole spacing, install a 1/2" narrow
washer between bolt head and bracket.
7. With hose in place on pump, install hose on tank standpipe. This
is a tight fit; use water as a lubricant (oils or greases may dam-
age hose). Work hose down standpipe until end of hose fits
against tank side.
8. Replace pump on bracket (over bolts); install lock washers and
nuts on bolts and tighten until pump is solidly bolted to bracket.
Remove wedges.
9. Recheck position of hose on tank standpipe and plastic elbow. If
properly in place, tighten one hose clamp over grooves on plas-
tic elbow and the other one half way down standpipe on tank.
10. Connect air volume control (AVC) and tubing to tank and pump
as shown.
INSTALLATION INSTRUCTIONS
VERTICAL TANKS
1. Use teflon tape on threaded pipe joints to tank. DO NOT use
pipe joint compound on plastics, as it may damage the plastic.
2. Install air volume control (purchase separately – Part No.
TC2120 for jet pump installations, Part No. FP238-2 for sub-
mersible pump insallations) according to instructions supplied
with air volume control.
3. Connect inlet and outlet pipes as shown in illustration.
4. When installing tank in a system having a submersible well
pump, be sure that orifices are installed and operating correctly.
See Submersible pump owner's manual for more information.
Pressure
Air Volume
Control
(TC2120)
Plastic
Compression
Tubing
Fitting
To
Service
Figure 2
Electrical
Disconnect
Control Box
(3 Wire Models Only)
Union
From Well
Relief
Valve
Gate Valve
Figure 3
Standard
(FIGS. 2 & 3)
Gauge
Discharge
Pipe
Relief
Valve
Regulator
Screw
Pump
Compression
144 0893
Fitting
Pressure
Gauge
Air Volume
Control
(FP238-2)
To House
Service
Pressure Switch
146 0893
U80-79 (Rev. 12/2/99)

Publicidad

loading

Resumen de contenidos para Flotec TC2120

  • Página 1 155 0893 2. Install air volume control (purchase separately – Part No. Figure 1 TC2120 for jet pump installations, Part No. FP238-2 for sub- mersible pump insallations) according to instructions supplied HORIZONTAL TANK REPAIR PARTS LIST with air volume control.
  • Página 2 2. Brancher le contrôleur de volume d’air (à acheter séparément - Réf. des pièces de pièce numéro de pièce TC2120 pour les installations à pompe à éjecteur, numéro de pièce FP238-2 pour les installations à Ensemble du Contrôleur d’air TC2120 pompe submersible) conformément aux instructions fournies...
  • Página 3 Ref. Descripción de parte bles) siguiendo las instrucciones incluidas con el regulador. Kit de Control de Volumen de Aire TC2120 3. Conectar la tubería de entrada y salida como se muestra en la Abrazadera - Manguera (2 Req.) U19-55SS ilustración.
  • Página 4 FLOTEC warrants to the original consumer purchaser (“Purchaser”) of its products that they are free from defects in material or workmanship. If within twelve (12) months from the date of the original consumer purchase any such product shall prove to be defective, it shall be repaired or replaced at FLOTEC’s option, subject to the terms and conditions set forth below.

Este manual también es adecuado para:

U19-55ssU74-37hU78-770pU78-961p