Home Decorators Collection D14724-28W Guía De Uso Y Cuidado página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
3
Attaching the vanity
□ Verify the vanity is level and back rail is plumb against the
wall. If necessary, turn the leg levelers (AA) to adjust the
vanity.
□ Using drill bit, drill two pilot holes through the back rail and
the finished wall. Verify the pilot holes are positioned to
ensure the lag bolts will engage the 2x6 backing material.
□ Secure the vanity to the finished wall with two 5/16" lag
bolts and washers (not provided).
5
Securing the vanity top
□ Place the vanity top (B) over the vanity (A).
□ Make sure the wall is straight and there are no gaps
between the wall and vanity top (B).
□ Remove the top (B) and apply a small bead of silicone
compound to the top of the cabinet before the vanity top is
set into position.
□ Firmly press the vanity top (B) into position; check the level
and evenness across the front of the vanity (A), and make
sure the vanity top (B) is flush to the wall.
A
AA
B
A
4
Installing the faucet to the vanity top
□ Follow the manufacturer's instructions to install the faucet
and drain assembly to the vanity top.
6
Reconnecting the water supply
□ Apply a small bead of silicone compound to the backside
of the vanity top (B).
□ Reconnect the faucet supply lines to the water supply and
reconnect the p-trap.
□ Install the pop-up drain.
□ Turn on the water supply or the home's main water supply
and test for leaks.
6
For questions, contact customer service at 1-800-986-3460 for assistance
HOMEDEPOT.COM/HOMEDECORATORS

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

1001 486 015

Tabla de contenido