STEP 3 - Marking Measurements
1.
Locate the 3 main height locations for your configuration.
2.
Measure up & mark the 84 in. shelf location.
3.
Mark the 42 in. shelf location.
4.
Mark the 72 in. shelf location.
5.
Draw a 6 ft. long level line out from wall end at 84in. location.
6.
Draw a 4ft. long level line out from wall end at 42 in. location.
7.
Draw a 2 ft. long level line out from wall end at 72in. location.
8.
Locate stud locations at level lines.
STEP 4 - Tower Assembly
1.
Place tower sides down with grooves facing up.
2.
Insert cam bolts at tower bottom hole locations.
3.
Insert cam nuts into tower bottom shelf with arrow facing bolt hole.
4.
Insert tower sides into tower bottom.
5.
Secure by turning cam nuts clockwise to tighten.
6.
Repeat for opposite tower side.
7.
Place tower top into notches at top of tower.
8.
Insert barrel nuts into tower sides with groove facing tower top.
9.
Insert barrel bolts into tower top & tighten with allen wrench provided (nut
position may need adjustement).
10. Place tower face down (nameplate typically designates tower front)
11. Place top tower bracket between 1 st & 2nd groove.
12. Place middle tower bracket between 8 th & 9th groove.
13. Place bottom tower bracket between last groove & tower bottom.
4