11. Align shelf end hardware with the wall mark & mark screw hole locations.
12. Secure shelf end to wall using #8 1 1/2 in. screws at hole locations (Use
wall anchors provided if no stud is present).
13. Align shelf end hardware with the tower mark & mark screw hole locations.
14. Secure shelf end to tower using #6 3/4 in. screws at hole locations.
15. Place tower & shelf onto hardware.
7
16. Secure shelf ends & L-clips using #4 3/4 in. screws at all locations.
STEP 7 - Installing Long Hang Shelf
On the 72in. level line space shelf mounting L-clip hardware equidistant in
the following manner:
•
2 L-clip hardware within the 24in. shelf location
1.
Repeat L-Clip installation process.
2.
The long hang is created by cutting the 24 in. shelf & bar to 21 3/4 in. wide.
3.
Double check shelf measurements (cut shelf & bar to span required).
4.
On the pilot hole side of the bar, measure in 4 in. from the end.
5.
Mark location & repeat for other end.
6.
Align side of bar spacer with the mark.
7.
Secure with #8 1in. screw.
8.
Repeat at each marked location.