17
• Install conduit and fittings as shown. To
minimize loosening due to pipe vibration, use
flexible conduit.
• Pull in power and ground wires, strip off 1/2 in
(13 mm) of insulation and terminate.
Power and ground wires
18
• Install lid.
• Apply insulation and cladding.
• Weather-seal the stand entry.
• Leave these instructions with the
end user for future reference.
Raychem-IM-H56046-JBS100A100A6-ML-1805
1/2 in
(13 mm)
3/4 in locknut
Water tight
conduit seal
conductors are
Conduit
nVent recommends the use
drain
of a conduit drain to prevent
water condensation build-up.
Weather seal
Make sure
not exposed.
nVent.com | 8