Testing And Troubleshooting - Vetus BS1252 Instrucciones De Instalación

Separador de baterías
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35
Testing and trou-
ble shooting
In case of doubt about the cor-
rect operation of the battery
splitter the following test can be
carried out using a simple mul-
timeter or voltmeter.
First check if wiring is connect-
ed as indicated in the diagrams
and that the minus terminals of
all batteries are interconnected.
Measure the voltages as indi-
cated in the diagrams on page
59.
14
090305.04
The engine is stopped, a possible battery charger
is switched off.
Carry out measurement A (B+ALTERNATOR).
Is the measured voltage equal to 0 Volt?
Carry out measurement B (battery voltage).
Is the measured voltage equal to the battery
voltage (e.g. 12,4 Volt) ?
Start the engine or switch on the battery charger.
Carry out measurement A and measurement B.
Do all measured voltages increase gradually?
See page 16, (2).
Battery splitter and installation are correct.
YES
YES
YES
Battery splitter
NO
NO
NO

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bs1253

Tabla de contenido