THE POWER LINE
THAT ARRIVES UNTIL THE
BUILDING HAS NEUTRAL
NOT
CONNECTIONS SCHEME 1
PE
BEP
PE
PE
Ground bar
CONNECTION MODES
Connecting the DPS at the point of entry or at the distribution board.
YES
THE NEUTRAL WILL BE GROUNDED
IN THE EQUIPOTENTIAL MAIN
BAR?
YES
BEP ou ground bar
N
PE
BEP or ground bar
NOT
POSSIBLE CONNECTION
CONNECTION SCHEME 2
BEP or ground bar
11
TWO SCHEMES
CONNECTION SCHEME 3
BEP or ground bar
N