3.
For 60 in. tub openings:
Using a level, make a mark 5 in. in toward
the tub.
For 72 in. tub openings:
Using a level, make a mark 8 in. in toward
the tub.
Then, again using a level, lightly draw a
vertical line down approximately 4 in.
Repeat this entire step for the other
end of the tub.
NOTE: If the tub opening differs from the
above openings, follow the chart in
TROUBLESHOOTING.
4.
Hold the 1 in. mounting bracket (E)
against the wall so that the mark from step
3 is centered in the top screw hole as
shown. Mark the location of the other
screw hole along the vertical line you
drew in step 3.
Repeat this entire step for the other
end of the tub, using the 7/8 in. mounting
bracket (D).
3
8 in.
5 in.
65 in.
For 60 in.
tub openings
4
E
6
For 72 in. tub
openings
IS35611