DUALSUN M-60-3BBP Serie Manual De Instalación, Uso Y Mantenimiento página 30

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Swimming pool system
A kit made with compression fittings allows the connection between the group of panels
and the transfer circuit.
This kit includes, for a line of panels, 2 D32/40 mm compression fittings and 2 D32 mm
compression plugs.
When the flexible inter-panel links are equipped with the inlet/outlet
connections, they are then easily connected to the Panel manifolds, without
tools, as shown below.
When connecting the inter-pane lines, it is preferable to start with the entry or cold line (bottom of the
panel). This then facilitates the electrical and hydraulic connection by lifting the top of the panel.
Figure 24 : Plugging of the DualQuickfit hydraulic fittings into the Spring Panel collector
Make sure to insert the DualQuickfit connector as straight as possible into the Spring Panel collector.
On tilted roofs, it is advisable to prepare the inter-panel links according to the roof layout before starting
the installation on the roof.
To ensure proper filling of the panels during commissioning, no more than 6 panels shall be placed in line
either in portrait or landscape.
Installation, operation and maintenance instructions - DualSun XXXM – 60 – 3BBP
Figure 25 : Maximum number of modules in line
V1.2 – March 2020
Page 29 sur 41

Publicidad

Tabla de contenido
loading

Productos relacionados para DUALSUN M-60-3BBP Serie

Este manual también es adecuado para:

M-60-3bbpn serieM-60-3bbpi serie

Tabla de contenido