2- Data Cable Connection To Evc04 Charging Station - VESTEL Klefr 6924 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

2- DATA CABLE CONNECTION TO EVC04 CHARGING STATION

You can use STP (shielded twisted-pair) cable with maximum length of 300 m for the connection
between the meter and the charging station.
1-
Remove rubber cork.
2-
Insert cable through the cable hole.
3-
Insert the cable through the RCCB housing holes.
4-
Connect the wires to the mainboard. See the following section.
1
2
3
© 2021 Vestel - All rights reserved
1
3
English - 7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Klefr 6934

Tabla de contenido