Kohler K-6805 Guia De Instalacion página 4

Ocultar thumbs Ver también para K-6805:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Hot
Plaster
Guard
2. Begin Installation - Ceiling Supplies
IMPORTANT! Perform these steps for ceiling installations only.
Remove the aspirator with a 3/8" hex wrench.
Rotate the yoke 180° so the supplies connect from the top of yoke.
NOTE: Rotating the yoke will reverse the direction that the lever
handles close. For proper lever handle operation, reverse the valve
units.
Before removing the valve units, position them to the open
position (cold = fully clockwise, hot = fully counterclockwise).
Remove the plaster guards.
Remove the valve units.
Reinstall the valve units opposite their original locations (right to
left, left to right).
Replace the plaster guards.
117124-2-A
Ceiling
Supplies
Aspirator
Cold
Valve Unit
4
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido