POOL SETUP ( continued )
You may have purchased this pool with the Intex Krystal Clear™ filter pump. The pump has its own
separate set of installation instructions. First assemble your pool unit and then set up the filter pump.
Estimated assembly time 30-60 minutes. (Note the assembly time is only approximate and individual
assembly experience may vary.)
1. Liner preparation
• Find a flat, level location that is free and clear of stones, branches or other sharp objects that may
puncture the pool liner or cause injury.
• Open the carton containing the liner, joints, legs, etc., very carefully as this carton can be used to store
the pool during the winter months or when not in use.
• Take out the ground cloth (8) and spread it over the
cleared area. Then take out the liner (6) and spread it
out over the ground cloth, with the drain valve directed
towards the draining area. Place the drain valve away
from the house. Allow the sun to warm up the liner
before inserting the beams (5) into the sleeve openings.
IMPORTANT: Always set up the pool unit with at least
2 persons. Do not drag the liner across the ground
as this can cause liner damage and pool leakage
(see drawing 1).
• During the setup of this pool liner, point the hose connections or openings in the direction of the electric
power source. The outer edge of the pool should be within reach of the pump's electrical connection.
2. Horizontal beams assembly
• The frame pool's legs (7) and beams (5) fall into two groups. The larger diameters are the horizontal
beams that are slid (pushed) into the sleeve openings at the top of the liner. The smaller diameters are
the vertical legs. Both these legs and beams fit into the T-joints (3).
NOTE: Sprinkle some talcum powder over the horizontal beams
before sliding them into the pool liner sleeve. This will make
removal of the beams from the liner easier during the disassembly
of the pool.
• Starting at any location, but always working in the same direction,
push the horizontal beam into the sleeve. Once the beam is centered
take one of the T-joints and attach the joint to one end of the beam.
Push the beam firmly into the T-joint. Repeat this procedure in a
circular fashion until all the beams and joints have been connected
(see drawing 2.1).
NOTE: It's important to start from one location and work in the
same direction until the last attachment. Do not start from multiple
locations as this will make the connections difficult for the last few
beams and joints.
The last joint connection may be difficult to complete. You can
do it though, if you first pull the last joint and beam out 4-6 inches
(10-15cm) towards you. Now insert the beam into the joint while
pushing them back into position. The beam will easily slide into
the joint (see drawings 2.2 & 2.3). Ensure that the last joint is fully
connected before proceeding to connecting the legs.
SAVE THESE INSTRUCTIONS
(117IO) CLEARVIEW PRISM FRAME™ PREMIUM POOL ENGLISH 7.5" X 10.3" PANTONE 295U 08/13/2020
English
117A
1
6
2.1
5
5
3
2.2
2.3
Page 7