L.B.White ZPHA2216S Instrucciones De Armado E Instalación

Panel de control de zona

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

ASSEMBLY and INSTALLATION INSTRUCTIONS
View these instructions online at www.lbwhite.com
Attention - Ventilation Requirements:
Be sure the air inlet grills, louvers, and dampers are inspected regularly and that they are free o0f dust, dirt, snow,
ice, frost, and other foreign material so that air may freely enter the building to provide adequate combustion and
ventilation air.
For proper and safe operation of the brooder installation, there shall be a combined infi ltration and natural and me-
chanical ventilation rate of not less than ¼ S.C.F.M. (standard cubic foot per minute) or 0.425 cubic meters per hour
per bird. Accordingly, higher ventilation is required for larger animals.
General Information:
• This zone panel is a remote mounted brooder controller that operates up to 680,000 Btu/h (199.3 kW) of brooders
within a specifi c heat zone of the confi nement building.
• Mount the panel to a fl at, stable, vertical surface within the building.
• Required gas supply pressure:
o LP or Natural Gas: 5 PSIG (34.5 kPa)
• Assemble the sensor bracket to a representative brooder. Refer to separate instructions that accompany the radiant
sensor bracket.
• Connect the zone panel's solenoids to a temperature controller capable of supplying 120 VAC
Sensor Location:
• Locate the building controller's sensor in a representative pen, which will dictate the operation of all brooders within
the zone.
o The producer must select a proper location for the sensor that is not affected by:
• Cold end walls
• Entry/exit doors
• Load out areas
• Air inlets
o Locating the sensor in a pen away from these areas prevents brooders from operating ay high heat for a
longer time, causing overheating of other pens and increased fuel usage.
• Locate the sensor above animal height or 2 feet (0.61 m) maximum from the fl oor and 4-8 feet (1.2 – 2.4 m) from
the center of the controlling brooder as necessary to achieve proper livestock temperature management.
WORLD PROVIDER - INNOVATIVE HEATING SOLUTIONS
411 Mason Street, Onalaska, WI 54650 • 800-345-7200 • 608-783-5691 • 608-783-6115 (fax) • www.lbwhite.com
Zone Control Panel

Publicidad

Tabla de contenido
loading

Resumen de contenidos para L.B.White ZPHA2216S

  • Página 1 ASSEMBLY and INSTALLATION INSTRUCTIONS Zone Control Panel View these instructions online at www.lbwhite.com Attention - Ventilation Requirements: Be sure the air inlet grills, louvers, and dampers are inspected regularly and that they are free o0f dust, dirt, snow, ice, frost, and other foreign material so that air may freely enter the building to provide adequate combustion and ventilation air.
  • Página 2 Zone Control Panel Installation and Operation Instructions Setting Pressures: 1. The zone panel must be set to ensure 5 PSIG (34.5 kPa) gas pressure is supplied to all brooders. • If necessary, install an adjustable regulator with a 5 PSIG (34.5 kPa) outlet pressure upstream of the zone panel.
  • Página 3 Zone Control Panel Installation and Operation Instructions 574011 Flex Connector (11 3/4 in. / 29.8 cm) 573756 pressure Gauge (0-5 PSIG) 574013 Regulator, 5 PSIG (34.5 kPa) inlet, 2.0 PSIG (13.8 kPa) outlet 573703 Solenoid Valve (Low heat) 500-00820 Vent Screen 573703 Solenoid Valve (High heat) 574012 Flex connector...
  • Página 4 Service Contact your local L.B. White dealer for replacement parts and service. You may also call the L.B. White Company, LLC at 1-800-345-7200, for assistance, or email us at customerservice@lbwhite.com. Be sure that you have your heater model number and confi...
  • Página 5: Instrucciones De Armado E Instalación

    INSTRUCCIONES DE ARMADO e INSTALACIÓN Panel de control de zona Vea estas instrucciones en línea en www.lbwhite.com Atención (requisitos de ventilación): Asegúrese de inspeccionar regularmente las rejillas de entrada de aire, las persianas y las compuertas, y que estén limpias y libres de polvo, suciedad, nieve, hielo, escarcha, y otros materiales extraños de modo que el aire pueda ingresar libremente al edificio y proporcione una combustión y ventilación adecuadas.
  • Página 6: Ajuste De Las Presiones

    Instrucciones de instalación y de uso del panel de control de zona Ajuste de las presiones: 1. Se debe configurar el panel de zona para asegurar que se suministre una presión de gas de 5 PSIG (34,5 kPa) a todas las incubadoras. •...
  • Página 7 Instrucciones de instalación y de uso del panel de control de zona Conector Flex 574011 (11 3/4 pulg./29,8 cm) Manómetro 573756 (0-5 PSIG) Regulador 574013, entrada de 5 PSIG (34,5 kPa), salida de 2,0 PSIG (13,8 kPa) Válvula solenoide 573703 (bajo calor) 500-00820 Rejilla de ventilación...
  • Página 8 Servicio Contáctese con su proveedor de L.B. White local para recibir piezas de repuesto y servicio. También puede llamar a LB White Company, LLC al 1-800-345-7200, para recibir asistencia, o enviarnos un correo electrónico a customerservice@lbwhite.com. Cuando llame, asegúrese de contar con el número de modelo del calefactor y el número de configuración.

Tabla de contenido