INSTALLATION
Mounting the condensation discharge pipe in the horizontal version
To mount the horizontal bowl on the MVP versions refer to
the instructions in kits KVXO.
-
check that the "L" pipe and the flexible rubber hose
are correctly connected to the bowl.
-
slide in the side of the machine keeping the pipe in
position up against the front grill.
-
fully close the side checking that the pipe remains
blocked in the special grove on the side.
A
connection pipes
2.9
Filling the system
When starting up the system, make sure that the hydraulic
unit lockshield is open. If there is no electric power and the
2.10
Evacuating air while filling the system
-
Open all the system interception devices (manual or
automatic);
-
Start the filling by slowly opening the system water
filling tap;
-
For the installed in a vertical position, take a screwdriver
and act on the highest breather of the battery; for
appliances installed in a horizontal position, act on the
highest positioned breather; for the 4-pipe versions
act on the highest breathers on both batteries.
Venting of the battery
A
26
N.B. for the horizontal installation carefully note the
following precautions:
-
make sure that the machine is installed perfectly level
or with a slight inclination towards the condensation
discharge;
-
insulate carefully the inflow and outflow pipes up to the
machine union to prevent any drops of condensation
outside the same collection bowl;
-
insulate the bowl condensation discharge pipe along
all of its length.
B
burglary
B
A
ø14mm
thermo-valve has already been powered use the special
cap to press the valve stopper to open it.
-
When water starts coming out of the breather valves
of the appliance, close them and continue filling until
reaching the nominal value for the system.
Check the hydraulic seal of the gaskets.
It is advisable to repeat these operations after the appliance
has been running for a few hours and periodically check
the pressure of the system.
A
A
U
I
S