Initiation/Operating Control; General; Venting; Operating Control - Biral AX 12 Instrucciones De Instalación Y Funcionamiento

Bombas de circulación
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 75
56
english

7. Initiation/operating control

7.1 General

Flush system thoroughly without pump. See section 4.
Fill and de-aerate the system properly.
Only put the pump into operation when the system is full.
Switch on the distribution voltage.

7.2 Venting

Venting of the pump, particularly of the motor space,
is performed automatically after a brief period of operation.
Running dry briefly (max. 2 mins.) does not harm the motor.
It is recommended to run the pump briefly on «max»
to ensure rapid venting of the system.
Warning
The pump must not be operated without water!
There is a danger of scalding

7.3 Operating control

One LED must always be lit and the present power consumption
must be displayed.
(See section 6.1 item 6)

7.4 Deblocking

Not necessary. Motor starts with high torque, see section 8.

8. Maintenance, servicing

Before performing maintenance on the pump,
make sure that the pump is taken out of operation,
disconnect all poles from the power grid, and secure
from switching on again.
Only have trained staff do this work.
Mind the operating instructions.
Only perform this work when the system is at standstill.
Take the pump off power.
Switch off the fuse and put on warning signs.
The media in the system may scald you.
The hot surfaces may scald you.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ax 13Axw 12Axw 13

Tabla de contenido