Parts Included; Tools Required - HyLoft 00720 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

24" to 32"

Parts Included:

(2) Wire Grids
18" x 36"
(4) Carriage Bolts 1/4" x 1-1/4"
(6 mm x 32 mm)
(8) Lag Screws 5/16" x 2-1/2"
Use 1/2" Wrench
(2) Plastic Tie Straps

Tools Required:

3/16"
Hand or
Hammer
Drill Bit
Power Drill
Page 2
ASSEMBLY INSTRUCTIONS
36" x 36" Ceiling Storage Unit
Joists
apart
Sinker Nail
IMPORTANT: Read through entire instructions before beginning any installation.
(2) Crossbars
(2) Carriage Bolts 6" x 1"
(16) 1/4" Flange Nuts
Use 7/16"
Wrench
(4) Sinker Nails
OR
(1) 5/16", (2) 7/16", & (1) 1/2"
Wrench, Socket Wrench or Nut Driver
There is no need to return this item to the store.
Instead call our TOLL FREE HOTLINE:
Use 7/16"
Wrench
(2) #6 Hex Nuts
Use 5/16"
Wrench
M
Stud/Joist
Framing
Pencil
Finder
Square
(optional)
(optional)
Item #: 00720 & 00721
MISSING A PART?
1-800-253-1561
(8) Downrods Bent
(12) Hex Bolts 1/4" x 1/2"
(6 mm x 13 mm)
(2) #6 Washers
Hyloft Sticker
Eye Protection
Tape Measure
Step Stool
Ladder or

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

00721

Tabla de contenido