HyLoft 01000 Instrucciones De Montaje página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation time: Approximately 30 minutes.
Important: Read through entire instructions before beginning any installations.
1. Mounting the Master Rails to Wall Studs
1A:
Using a stud-finder, locate 5 wall studs that are 16" center to center apart.
Note: If studs are not on 16" centers, you may need to drill new matching holes in Master Rails.
IMPORTANT: Unit MUST be installed into wall studs. Do not use anchors
for installation into sheet rock.
Place one Master Rail (B) with holes aligned to studs and verify that the Master Rail is level.
Mark the location of the holes with a pencil. Pre-drill the holes using a 3/16" drill bit. Mount
the first Master Rail (B) with (3) Lag Screws (C) using a 1/2" nut driver or socket wrench.
Note: Master Rails must be mounted with the longer .63" lip on top and shorter .43" lip on bottom.
IMPORTANT: Do not over-tighten the Lag Screws (max 10 ft. lbs.).
They only need to be fully seated, no more. Do not use an impact driver.
1B:
Attach second Master Rail (B) by interlocking it with the first and aligning holes with 16" wall stud
centers. Verify that both Master Rails are level and mark holes with a pencil. Pre-drill using a 3/16"
drill bit. Mount the Master Rail (B) with 3 Lag Screws (C) using a 7/16" nut driver or socket wrench.
Note: If necessary to mount to uncommon hole pattern, drill new matching holes in Master Rails.
Page 3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

01004

Tabla de contenido