Normal Operation; Basic Programming - Pentair Fleck5800 LXT Guia Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
User Guide Fleck 5800-LXT
3.3.
Description and components location
3.4.
By-passing
If the system is equipped with a bypass and if a problem occurs, turn the valves to bypass the system as shown in the picture
below.

Normal operation

4 .
Programming
Note:
The controller must be plugged to be programmed.
After 5 minutes without any button pressed, the unit returns to normal operation without saving.
4.1.

Basic programming

Note:
Menus are displayed by pressing MODE.
Time of day
Note:
Determine the time of day.
A
Press MODE until display position point to the Time of Day icon.
B
Press and hold
C
Set the time with
D
Press
to validate the selection and return to the service mode.
6 / 36
Brine
Drain
Mixing device
Outlet
Meter
Inlet
Softening System
In
Out
or
until the Programming icon appears.
or
.
Regen button
Down button
Display
MODE button
Up button
In Bypass
Softening System
In
Ref. MKT-UG-005 / D - 15.11.2019
Out

Publicidad

Tabla de contenido
loading

Tabla de contenido