Installation & Operation; Cabinet Location And Installation Guidelines - Premium PRN91DX Manual Del Uso Y Cuidado

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION & OPERATION
IMPORTANT!!! PLEASE READ BEFORE
■ If the unit has recently been transported, please let unit stand still for a
minimum of 24 hours before plugging it in.
■ Make sure that the unit drops down to the desired temperature before
loading the unit with product.
■ Make sure that there is proper ventilation around the unit in the area
where it will operate.
■ Make sure all accessories are installed (i.e. shelves, shelf clips, casters)
before plugging the unit in.
■ Please read through the Operation / Owner's Manual in its entirety
before installation.
CABINET LOCATION AND INSTALLATION
■ Install the unit on strong and leveled surfaces.
■ Unit may make noises if the surface is uneven.
■ Unit may malfunction if the surface is uneven.
■ If the floor is not flat, please use something to make sure the base
of this unit on horizontal level.
■ Install the unit in an indoor, well-ventilated area.
■ Unit performs more efficiently in a well-ventilated area.
■ For best performance, please maintain clearance of 4" on the back
of the unit, 12" on the top of the unit, and at least 4" space around
the unit
INSTALLATION
GUIDELINES
1

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido