Descargar Imprimir esta página

Pfister LG16 Serie Manual De Instrucciones página 3

Ocultar thumbs Ver también para LG16 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

8
8B
8A
8C
8 BOTTOM POST AND BAR INSTALLATION
Orient Bottom Post (8A) so that the Support Socket (8B) faces up. Insert Mounting Screw
(8C) through the hole on Bottom Post (8A) and Back Flange (8D) and tighten until is flush
with the wall. Do Not Over Tighten! Insert one end of Bar (8E) into Support Socket (8B).
9
9A
9B
9 TOP POST AND BAR INSTALLATION
Insert the Top Post (9A) into the other end of the Bar (9B). Insert Mounting Screw (9C)
through the hole on Top Post (9A) and Back Flange (9D) and tighten until is flush with the
wall. Do Not Over Tighten!
8D
8E
8B
9D
9A
9C
ENGLISH
10
10A
10 BUTTON INSTALLATION
Insert Decorative Buttons (10A) into Posts (10B). Apply with a small bead of silicone around
outer edge where post meets wall (10C).
11
11B
11D
11 DROP ELBOW & HOSE INSTALLATION
Apply PTFE plumbers tape on both ends of Pipe Niple (11A) (not included). Screw Pipe
Niple (11A) into the elbow inside the wall. The Pipe Niple (11A) is to project
the finished wall. Screw Drop Elbow (11B) onto Pipe Niple (11A) and tighten until Drop
Elbow is properly positioned and flush to the finished wall. Connect Hose (11C) into the Drop
Elbow Outlet (11D) by turning Metal Hose Fitting (11E).
3
10B
10C
10A
10C
10B
11A
11E
11C
1
/
" -
3
/
"
4
8
1
"-
3
" from
/
/
4
8

Publicidad

loading