H-6483, H-6484
π
H-6485
GRAB BAR
TOOL NEEDED
Electric Drill and 3/4" Bit
CERTIFICATION
Grab Bar meets or exceeds the applicable requirements
of all building codes, ADA criteria, 2010 ADAAG and
2009 ANSI standards.
RECOMMENDED INTEGRATION
For hollow wall construction, it is recommended that
grab bar fasteners are used with this product. See
H-6486 instructions for applications. Grab Bars are
designed to hold live loads and must be installed into
adequate structural blocking or with grab bar fasteners.
NOTE: For maximum safety and to meet ADA
requirements, grab bars should be installed
horizontally, 33 to 36" from the floor.
1.
Slide snap-on cover off mounting flange to expose
screw holes. (See Figure 1)
Figure 1
PAGE 1 OF 3
1-800-295-5510
uline.com
OPTIONAL TOOLS
3/4" Apache
1¼" Apache
200 Drill Bit
200 Drill Bit
(H-6486-BIT)
(H-6487-BIT)
Grab Bar x 1
MOUNTING AND INSTALLATION
Snap-On Cover
Mounting Flange
PARTS
2. For wall surfaces with structural blocking (i.e., wall
studs), mount using six stainless steel screws included.
(See Figure 2)
a. Place mounting flange against wall at desired
height and mark three screw holes with pencil.
b. Repeat for second flange.
c. Set grab bar aside and drill holes into wall where
marked.
d. Place grab bar back on wall and secure screws
into drilled holes.
e. Slide snap-on cover over each mounting flange.
Figure 2
3. For hollow wall construction, it is recommended to
use the H-6486 600 lb. capacity fasteners or H-6487
800 lb. capacity fasteners to mount the grab bar.
See Grab Bar Fastener instructions for detailed
application and mounting instructions.
Para Español, vea página 2.
Pour le français, consulter la page 3.
Stainless Steel Screw x 6
Screw Holes
0421 IH-6483