Elnur Gabarron SOLAR BOX USB Instrucciones De Instalacion Y Uso página 9

Gestor de excedentes fotovoltaicos acumuladores elnur gabarron
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. CONTENTS
-
1 x This Manual
-
1 x G Control Hub USB
-
2 x G Control PM Power Meter (Meter + Current transformer)
2. INSTALLATION
2.1. G Control PM installation
Install the 2 G Control PM meters following the below wiring diagram.
-
Home Consumption power meter. Install one G Control PM measuring the power consumption of the
home.
-
PV Generation meter. Install the other G Control PM measuring the energy generated by the Solar PV
installation. This meter must be installed after the inverter measuring the energy in the AC side.
8
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido