Installation
1
Removing the escutcheon
□
Loosen the escutcheons (1) from the grab bar (A)
base by gently tapping from the back.
NOTE: All screws must be mounted firmly into a wood stud.
Locate the center of the stud by using a stud finder or other
stud locating method.(Studs are usually 16 inches apart.)
A
3
Marking the installation location
□
With a pencil , mark the wall through three holes
on each mounting plate where screws will be used.
2
1
4
Positioning the grab bar
□
Locate the center of the stud by using a stud
finder (not included) or other stud locating
method.(Note:Studs are ususlly 16 in.apart).
16"
16"
Place the grab bar (A) on the wall where
desired so that the mounting holes a re
positioned over a wood stud. Use a level ,
if needed.
4
Drilling the mounting holes
□
Remove the grab bar (A) from the wall
and carefully drill pilot holes as mar ked.
NOTE: Ensure the holes are drilled into the
stud.
A