Technical Data; Assembly; Test Installation; Installation Tank - Graf 323001 Instrucciones Para La Instalacion Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5.1

Test installation

The container should be assembled on a trial basis before the final assembly to determine the position
the following connections:
Inlet
Overflow
After opening the connections it is important to remove and clean all the drilling and sawing swarf from
the tank.
5.2

Installation tank

The tanks consist of two identically constructed halves. For the
assembly, the half with the closed side is positioned on the
compacted and level ground surface. The profiled sealing ring is
then well coated with lubricating soft soap and pressed with the
ribbed side into the continuous perimeter of the inner seat recess.
Before the second half of the tank is set in position, the seal and
the seat recess of the upper half must also be well coated with
the lubricating soft soap. During the assembly it is important to
ensure that the seal does not slip out of the seat recess.
To secure the two halves, the connection clips are fitted first in a
counter-clockwise direction and then in a clockwise direction. To
assist in the assembly it may be necessary to press the two tank
halves together with a number of G-clamps. To do this, position 3
to 4 G-clamps at equal intervals around the lip of the tank and
then begin to tighten them evenly. Finally position the connection
clips by hand and then drive them securely into place using a
hammer with a piece of wood in between, the clips will then
locate in the final engaged position.
info@garantia.eu
www.garantia.eu
4.

Technical data

5.

Assembly

7 / 20
Upper tank half shell
Internal tank side
Lower tank half shell
Upper marking
Lower marking

Publicidad

Tabla de contenido
loading

Tabla de contenido