Terminator
10.
Route thermostat bulb through nut
and expeditor opening in junction box
base. If necessary, apply lubricant (user
supplied) to end of thermostat bulb.
Slide through conical grommet hole.
Push excess capillary tube through
expeditor.
13.
Take out thermostat. Mount junction box
base on expediter. Make sure to align
slots to properly orient junction box base.
Tighten nut with Terminator-LN-Tool. If
mounting horizontally, threaded gland
holes must face downward.
16.
Install thermostat and complete system
wiring. Terminal set screws shall be
tightened to a torque value of 1.4 Nm (12.4
lb-in). See page 5 for wiring details. Set
thermostat at desired setpoint.
The Heat Tracing Specialists
ZT-P-XP
TM
11.
Fix thermostat bulb and capillary tube to
pipe.
14.
Remove M25 dust cap. Install M25
power gland (order separately) and M25
blind plugs.
17.
Install junction box lid and twist hand
tight. Insert screwdriver into ratchet slots
located on side of junction box base.
Use screwdriver to ratchet on junction
box lid. Lid will rotate 30 degrees.
®
INSTALLATION PROCEDURES
12.
15.
IP66
PN 27656
-45°C Ta + 55°C
0539
II 2 G & D EEx ed II C T5
DEMKO 02ATEX132552X
18.
4
Mount expediter to pipe using pipe band.
Do not band over cable. Tape cable
expansion loop to pipe.
Install power cable (if necessary).
Lid latch mechanism fully engaged. To
remove lid, repeat step 17 but in the
opposite direction.