6
6B
6A
6C
6D
6 UNDERBODY INSTALLATION
From underneath, insert Underbody (6A) through Mounting Holes (6B), with shank
labeled with Red Tag (6C) on left side. Align Socket (6D) onto Spout Shank (6E), push
Underbody (6A) up until the top of Socket (6D) reaches the Spout Shank Stop (6E). Be
careful not to damage the O-Ring Seal (6F). Attach Locknut (6G) and tighten loosely
until Underbody (6A) is assembled to the Spout Shank (6E).
STOP
INSTALLATION WITHOUT DECK PLATE
7
7C
7B
7D
7 MOUNTING RINGS & SPOUT GASKET INSTALLATION
If desired, place a small bead of plumber's putty to the underside of Mounting Rings
(7A). Place Mounting Rings (7A) onto the Outer Sink Holes (7B). Place Spout Gasket
(7C) onto the Center Sink Hole (7D).
ENGLISH
6B
6E
6F
6G
Go To Step 10
7A
7B
8
8F
8A
8B
8D
8 SPOUT INSTALLATION
Insert Spout Shank (8A) through Spout Gasket (8B) and Center Sink Hole (8C). From
underneath sink, place Thrust Washer (8D) onto Spout Shank (8A) and tighten with
Mounting Nut (8E). Before final tightening, be sure Spout (8F) is centered and facing
forward.
Caution: Do not over tighten!
9
9B
9A
9C
9D
9 UNDERBODY INSTALLATION
From underneath, insert Underbody (9A) through Mounting Rings (9B), with shank
labeled with Red Tag (9C) on left side. Align Socket (9D) onto Spout Shank (9E), push
Underbody (9A) up until the top of Socket (9D) reaches the Spout Shank Stop (9E). Be
careful not to damage the O-Ring Seal (9F). Attach Locknut (9G) and tighten loosely
until Underbody (9A) is assembled to the Spout Shank (9E).
3
8C
8E
9B
9E
9F
9G