Cudy 24GE(PoE)+2G Combo+2GE Guía Del Usario página 10

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Installation the Switch
This part describes how to install your Ethernet Switch and make connections to it. Please follow the following instructions
in avoid of incorrect installation causing device damage and security threat.
 Before cleaning the switch, unplug the power plug of the switch first. Do not clean the switch with wet cloth or liquid;
 Do not place the switch near water or any damp area. Prevent water or moisture from entering the switch chassis;
 Do not place the switch on an unstable case or desk. The switch might be damaged severely in case of a fall;
 Ensure proper ventilation of the equipment room and keep the ventilation vents of the switch free of obstruction;
 Make sure that the operating voltage is the same one labeled on the switch;
 Do not open the chassis while the switch is operating or when electrical hazards are present to avoid electrical shocks.
Desktop Installation
Install the Switch on a desktop, please attach these cushioning rubber feet provided on the bottom at each corner of the
Switch in case of the external vibration. Allow adequate space for ventilation between the device and the objects around it.
The installation diagram is as follows:
Rack-mountable Installation
The switch is rack-mountable and can be installed on an EIA-19 inch equipment rack. To do this, first, please install the
mounting brackets on the switch's side panels (one on each side), secure them with the included screws, and then use the
screws provided with the equipment rack to mount the switch on the 19 inch rack.
- 3 -

Publicidad

Tabla de contenido
loading

Productos relacionados para Cudy 24GE(PoE)+2G Combo+2GE

Tabla de contenido