Descargar Imprimir esta página

Grohe Atrio 24 016 Manual De Instrucciones página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

Application
Operation is possible in conjunction with:
- Pressurized storage heaters
- Thermally controlled instantaneous heaters
- Hydraulically controlled instantaneous heaters
Operation with low-pressure storage heaters (displacement water
heaters) is not possible.
Specifications
• Max. flow
• Flow pressure
- min.
- recommended
- greater than 72.5 psi, fit with pressure reducing valves
• Max. operating pressure
• Test pressure
• Temperature
- max. (hot water inlet)
• Water connection
Notes
• Installation of backflow protection must comply
with local codes and regulations.
• Major pressure differences between cold and hot water supply
should be avoided.
Installation
See dimensional drawing on fold-out page I.
Flush pipes thoroughly!
Side valves
• Valve marked with "L" (left close) on the top edge of the
cartridge (A) with blue tape should be mounted on the right (cold
water) side, see fold-out page II, fig. [1].
• Valve marked with "R" (right close) on the top edge of the
cartridge (A) with red tape should be mounted on the left (hot
water) side.
1. Screw the mounting set (B) to the bottom of the thread of the
side valve (C), see fig. [1].
Make sure that the rubber washer (B1) is on the top of the fiber
washer (B2).
2. Insert the side valve (C) through the basin hole from below.
3. Place the escutcheon O-ring (D1) on the basin and screw down
the escutcheon (D) until it stops.
4. Screw the cap (E) down to the escutcheon (D).
5. Secure snap insert (F) with screw (G) to the stem of the ceramic
cartridge (A).
6. Tighten the mounting set (B) from below to secure the valve.
Vacuum breaker
1. Insert the vacuum breaker body with seal (H) and nut (H2)
through the basin hole from below, see fig. [2].
2. Slide on seal (H1) with ring (J) and screw on nut (K).
The distance from the top of the body to the bottom of the ring
must be 2 3/16", see fig. [3].
3. Secure vacuum breaker body to the basin by tightening
nut (H2), see fig. [2].
4. Slide on tube (L) and cover (M), see fig. [4].
5. Tighten the connection tee (N) to the vacuum breaker body with
connection nut (O).
1
English
Diverter
1. Insert diverter body with nut (P) and seals (Q), (R1 or R2) and
the lift rod assembly through the basin hole from below,
see fig. [5].
2. Slide on seal (R3 or R4) and screw on nut (S) until it is at the
same height as the top of the diverter body (S1).
3. Secure diverter body to the basin by tightening nut (P) using
an 36mm open-ended spanner.
4. Slide on escutcheon (T), see fig. [6].
5. Mount the diverter knob (U) to lift rod assembly (U1).
13 L/min or 3.4 gpm/45 psi
Verticle spray
1. Insert body with seals (V) from below, see fig. [7].
7.25 psi
2. Slide on seals (V1) and secure with nut (W) using an
14.5 - 72.5 psi
22mm open-ended spanner.
3. Jet-height can be decreased by turning the nozzle (X) to the left,
145 psi
turning to the right increases jet-height.
232 psi
4. Screw on spray face plate (W1).
176 °F
Fit pop-up drain (28 957), see fold-out page I, ensure that flange
of pop-up drain is sealed.
cold - Right hand
hot - Left hand
Connect wideset bidet, see figs. [8] and [9].
1. For this purpose the supply pipes must be installed on to the
angle stops (or other supply points).
2. The cold water supply should be connected on the right, the hot
water supply on the left side.
3. Connect both side valves to the connection tee via the two short
flexible hoses.
4. Connect the vacuum breaker with the blue-marked hose to the
top of the tee and the unmarked hose to the diverter ellbow.
5. Connect the diverter to the verticle spray via the long flexible
hose.
Open cold and hot water-supply and check connections for
watertightness!
Maintenance
Inspect and clean all parts, replace as necessary and grease with
special grease.
Shut off cold and hot water supply.
I. Headpart, see fold-out page II, fig. [10].
1. Remove handle (45 603) or lever (45 609).
2. Unscrew screw (G) and pull off snap insert (F).
3. Unscrew headpart (A) using a 17mm socket wrench.
4. Change complete headpart (A).
II. Vacuum breaker, see fig. [11].
1. Pull off cover (M) and tube (L).
2. Remove circlip (Y), pull out and replace double-ball vacuum
breaker (Z).
3. Loosen nut using an 21mm open-ended spanner and replace
check valve (08 565), see fold-out page I.
III.Vertical spray, see fig. [12].
Unscrew and clean spray face plate (W1) and nozzle (X).
Assemble in reverse order.
Replacement parts, see fold-out page I ( * = special accessories).
Care
Instructions for care of this faucet will be found in the Limited
Warranty supplement.

Publicidad

loading

Este manual también es adecuado para:

Atrio 24016000Atrio 24016en0