Kohler STERLING 402024 Manual Del Usuario página 4

Ocultar thumbs Ver también para STERLING 402024:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Wax Seal
Closet Flange
2. Install the Bowl
Install a supply shut-off valve.
Record the model number in the Homeowners Guide.
Lay the toilet down onto a padded surface.
From the bottom of the toilet, firmly press a new wax seal around
the toilet outlet.
Remove the temporary rag (if used) from the toilet flange hole.
Align and lower the toilet over the flange and T-bolts.
CAUTION: Risk of external leakage. Do not lift or rock the
bowl after placement. If you break the watertight seal, you must
install a new wax seal.
Apply your full body weight around the toilet to set the seal.
Place the plastic bolt cap bases over the T-bolts in the "up"
position as marked.
Place the metal washers and nuts on the plastic bolt cap bases
and T-bolts.
CAUTION: Risk of product damage. Overtightening may cause
breakage or chipping of the vitreous china.
Carefully tighten the nuts.
CAUTION: Risk of product damage. Protect the vitreous china
from exposure to the saw blade when cutting off excess T-bolt
length.
If the T-bolts extend more than 1/4" (6 mm) over the top of the
nuts, cut off the excess.
1035429-2-C
Bolt Cap
Nut
Washer
Bolt Cap Base
T-Bolt
T-Bolt
4
Sterling

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sterling 402025Sterling 402027Sterling 402028

Tabla de contenido