GE UPK3 Instrucciones De Instalación página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALL THE PUMP KIT
5
A. Uncoil the 10-foot long discharge tubing. Push
one end completely onto the barbed discharge
elbow of the pump and securely fasten it with
the small metal hose clamp. Use pliers to open
the hose clamp.
Discharge
Elbow
B. Route the other end of the discharge tubing
through the routing panel in the back of the
unit. Put the end of the discharge tube into a
drain.
C. Place the pump over the bolts located on the
base of the ice machine and secure with the
two nuts and washers provided in the kit.
Pump drain
Bolts
discharge tubing
Installation Instructions
Discharge
Hose
Tubing
Clamp
Pump drain
discharge tubing
Nut & Washer
D. Route the straight portion of drain tube through
the hole in switch assembly bracket.
Drain tube
Snap fit
Pump
clamp
inlet
E. Connect drain tube to pump inlet and secure
with the white snap fit clamp from the kit.
F. Connect the pressure switch hose to the drain
hose.
Drain hose
G. Mount the switch assembly bracket to the base
using two provided sheet metal screws and lock
washers.
Sheet metal
screws &
lock washers
H. Trace the black and white power cord from the
switch assembly to the black and white power
cord coming from the unit near the compressor.
Make sure that the wires lay on the left side of
the pump if you are facing the unit from behind.
Unplug the current black and white wire's
connection. Plug the black and white wire's
connector from the unit into the black and white
connector from the switch assembly. Repeat
with the red and white connections. It is not
necessary to replace the wire tie that is removed
to disconnect the connector. Connect the 3-pin
connector from the switch assembly bracket to
the 3-pin connector on the pump.
Switch
assembly
bracket
Pressure
switch
hose
Switch
assembly
bracket
3

Publicidad

Tabla de contenido
loading

Tabla de contenido