SMART-PAK COMBO BOARD HANGING INSTRUCTIONS
Because of the wide variation of mounting surface construction, specific mounting hardware is not included. For the most secure mounting, the
accessory tray and the "L" hangers should be attached directly into wall studs. Ghent recommends using #8 x 1 1/4" pan head type self-tapping screws
(not included). When wall studs can not be used, we recommend using wall anchors (not included).
It is also recommended that at least two people perform the installation of the board.
STEP 1: Press the accessory tray end caps over the ends of accessory tray. See Illustration 1.
STEP 2: Determine the desired height from the floor to the bottom of the board. Scribe a level line on the wall at that distance. Position the bottom edge
of the accessory tray along this line. Using the groove at the rear of the accessory tray as a guide, drill 1/8" diameter holes through the accessory tray
and into the wall studs. Fasten the accessory tray to the wall with screws. See Illustration 2.
STEP 3: Lift and center the marker board section onto the mounted accessory tray. (If you are installing a SmartPak Combo board without a header tack
board, skip to step 4b.) See Illustration 3.
STEP 4a: Place the map/hanger rail over the top of the marker board and center it on the marker board. (If you are installing a SmartPak Combo board
with only one side tack board, position the map/hanger rail ¼" in from the side of the marker board to allow clearance for the side hanger rail. Using the
groove at the rear of the map/hanger rail as a guide, drill 1/8" diameter holes through the map/hanger rail and into the wall studs. Fasten the map/hanger
rail to the wall with screws. See Illustration 3. Lift and center the header tack board onto the map/hanger rail.
STEP 4b: Scribe a line on the wall along the top edge of the marker board (or header tack board). Remove the board and position the top edge of the "L"
hangers along this line at the wall stud locations. Locate each screw in the center of each hanger's slot. Snugly fasten each hanger with screws to the
wall. See Illustration 4.
STEP 5: Tap the "L" hangers up until the screw is resting in the lower end of the hanger slot. Replace the marker board (or header tack board) onto the
accessory tray (or map/hanger rail) and tap the "L' hangers down against the top frame. Using the "L' hangers as a template, mark the hole locations for
the top mounting screws. Remove the board, drill 1/8" diameter holes at each of the marked locations and reattach the board with the screws provided.
See Illustration 5.
STEP 6: Position the side hanger rail over the side of the mounted marker board, and header tack board, as shown. Align the top end of the side hanger
rail with the top of the marker board (or header tack board). Using the holes in the rail as a guide, drill 1/8" diameter holes through the rail and into the
wall. Fasten the side hanger rail to the wall with screws. See Illustration 5.
STEP 7: Insert the side tack board in the side hanger rail. Align the top of the side tack board with the top of the marker board (or header tack board).
Scribe a line on the wall along the top and bottom edges of the side tack board. Remove the side tack board and position the bottom edge of the lower
"L" hangers along the lower line at the wall stud locations. Fasten the lower "L" hangers to the wall with screws. Position the top edge of the upper "L"
hangers along the upper line at the wall stud locations. Locate each screw in the center of each hanger's slot. Snugly fasten each hanger with screws to
the wall. See Illustration 6.
STEP 8: Tap the upper "L" hangers up until the screw is resting in the lower end of the hanger slot. Replace the side tack board onto the lower "L"
hangers and tap the upper "L' hangers down against the top frame. Using the "L' hangers as a template, mark the hole locations for the upper and lower
mounting screws. Remove the side tack board, drill 1/8" diameter holes at each of the marked locations and reattach the board with the screws provided.
See Illustration 7.
STEP 9: Repeat steps 6, 7, and 8, for the other side of the board, if required.
STEP 10: Place the map rail end caps over the ends of the map/hanger rail. Using the end cap as a template, drill 1/8" holes through the map/hanger rail
and secure with the screws provided. See Illustration 8.
1
MyBinding.com
5500 NE Moore Court
Hillsboro, OR 97124
IS-SPC 6/11
Toll Free: 1-800-944-4573
Local: 503-640-5920