ENG
4.5.5.3
Unit preparation – fitting the bracket
Fig. 19: Mounting the bracket
Operating Manual | Roof-mounted Cooling Unit | Multi Controller (MC) – 230 V | 086100021d
Procedure
1.
Puncture the insulation of the bracket opening (1) with a
screwdriver. Turn 2× to the right and 2× to the left.
2.
Mount the two brackets (3) with the four screws (2) and the four
washers (accessory kit).
–
The openings of the brackets face forwards.
3.
Remount the cover and the front flap in reverse order.
4.
Tighten the screws and plug in the earthing cables.
Preparation of the unit is completed. The cooling unit is ready for
assembly with the quick-change frame.
G00041
39/40