BLACK&DECKER Price Pfister ASHFIELD 42-YP Serie Guia De Inicio Rapido página 3

Grifo monomando para el baño
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7
7E
7D
7B
7C
7 SECURING FAUCET
From underneath sink, secure Faucet Body (7A) by placing Metal Washer (7B)
and threading Long Nut ( 7 /16 Hex.) (7C) onto Mounting Post (7D). Make sure
that the bumps on Metal Washer (7B) are facing up. Tighten loosely, make
sure Handle (7E) swings equally in both directions. Firmly hand tighten Long
Nut (7C). Secure Long Nut (7C) not to exceed a 1/4 turn.
Caution: Do not over tighten!
8
8C
8B
8A
HOT
8 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (8A) to Faucet Inlets (8B). Hot water supply line
goes to hot inlet fitting indicated by red tag (8C). (Supply lines not included).
Follow manufacturer's instructions when installing supply lines.
9
9 POP-UP ROD CONNECTION
Insert Lift Rod (9A) into hole at the back of Faucet Body (9B). Gently, slide Lift
Rod (9A) down the hole in Faucet Body (9B).
ENGLISH
7A
8B
8A
COLD
9A
9B
3
DRAIN BODY INSTALLATION
10
10A
10 POP-UP INSTALLATION
Install and adjust Pop-Up (10A) using separate instructions supplied with the
Pop-Up assembly.
11
11 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below
the sink.
FAUCET FUNCTION
OPEN
12
12A
12 VALVE FUNCTION
By lifting the Lever Handle (12A) up, the valve will be activated allowing water
to flow. The water flow will increase by continuing to lift up the Lever Handle
(12A). By rotating the Lever Handle counter-clockwise, the water temperature
will decrease to cold flow only. By rotating the Lever Handle clockwise, the
water temperature will increased to hot flow only.
HOT
COLD
HOT
COLD
12A

Publicidad

Tabla de contenido
loading

Tabla de contenido