APPLICATION INFORmATION
EN
A P P L I C A T I O N I N F O R m A T I O N
1. Bef ore app l y i ng t h e C r y o/ Cu ff,
p repa re th e c oo l e r (F i gur e 1)
•
Connect the blue tube to cooler.
•
Add cold water to line inside cooler.
•
Fill with ice.
•
Lay insulation disk on top of ice. Attach cooler lid snugly.
•
Allow five minutes with occasional shaking to chill water.
2. A lw ays a ppl y EMP T Y C r y o/Cuff
( F igure 2 )
•
Use only Aircast Cryo/Cuffs and ArcticFlow Cuffs with
Aircast Cryo/Cuff IC Unit. Cuff is the Applied Part.
•
Carefully and completely read instructions supplied with
the specific Cryo/Cuff prior to application. Please follow
the instructions below to continue cooler preparation.
3 . F ill and pre ss ur i ze C r y o/ Cuff
( F igure 3)
•
To fill cuff: Connect blue tube to the cuff. Raise cooler no
more than 15" (38cm) above the cuff for approximately 30
seconds while Cryo/Cuff fills.
•
To correctly position cooler: Place cooler on stable surface.
The cooler base should be even with the cuff.
NOTE: To AVOID excessive pressure during use, DO NOT
raise the cooler higher than 15" (38 cm) above the Cryo/
Cuff.
•
To turn cooler on: Plug power supply into wall outlet and
connect cord to lid.
•
To turn off the equipment disconnect the power supply.
•
To refill cooler: When Ice has melted , unplug the cooler
and repeat items 1-5 under Step 1.
•
For specific cuffs, please refer to instructions for
installation of each cuff and follow procedure above.
4
Figure 1
Figure 2
Figure 3