Water2Buy W2B180 Manual Del Usuario página 8

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Check for leaks. We
recommend regular checks
for leaks for the first 24
hours after install.
IMPORTANT: Check for
leaks at all joints and
connections after turning
on the mains water. After 3
hours check for leaks at all
joints and connections.
We recommend a further
check after 24 hours.
8
Check brine suction hose
Check that the end of the brine suction
hose is connected securely inside the
brine tank.
The brine suction pipe on the inside
should be wedged at the size of the blue
vessel. The flotation buoy end of the pipe
should be on the bottom of the brine
tank
Fill the tank with water softener salt. Salt
levels need to be maintained at
approximately 100mm above the bottom
of the tank and 50mm from the top of
the tank.
Add 3-4 litres of water into the tank on
top of the salt.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

W2b200W2b500W2b780W2b800

Tabla de contenido