Installation - Steren LAM-073 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

Installation height: 1.5m to 3m
1.- Carefully remove the lamp from the box.
2.- Place the lamp´s body in the desired location.
3.- Check points of fasteners.
4.- Drill two punch holes that apply to the lamp case.
5.- Place two anchors (not included).
6.- If you want to hang it up: screw lamp to the wall
with two screws (not included). Insert the two screws in lateral slots.
6

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido