Parts Included
A. Waste Bins (3)
B. Sliding Assembly (1)
C. Mounting Screws (4)
D. Lids (if supplied) (3)
B
A
C
D
Tools Required
• Phillips Screwdriver
• Tape Measure
• Pencil
Optional
• Drill with 1/16" bit for Pilot Holes
Product Assemblies
PLSW15-3-20
PSW15-3-20
2700 Oak Industrial Drive NE , Grand Rapids, MI 49505 USA
800.253.1561 • 616.459.3311 • www.kv.com
SLIDING TRIPLE WASTE BINS
Installation Instructions
Inspect all parts and read all instructions prior to
beginning assembly and installation.
Place sliding assembly on cabinet floor, right behind the back edge of the cabinet
1
face frame. If installing in a frameless cabinet
front of cabinet opening, and align sliding base assembly parallel to cabinet
opening. Close door to make sure the assembly will not hold cabinet door open.
Also, check to see if unit will clear the door opening when fully extended. Once
position is determined, fasten in place using four mounting screws provided and the
Phillips head screwdriver.
Optional step: Mark placement of mounting holes with a pencil, remove sliding
base assembly and drill pilot holes for fastening screws. Place sliding base assembly
back into position and fasten with the provided screws.
Insert bins into cages. Place lids on top of bins (if supplied). The orientation of your
2
bins is demonstrated in the Top View chart below. If your unit does not come pre-
packed with lids and you would like lids, visit www.kv.com to purchase the lids you
require. Installation is now complete.
1
©2009 Knape & Vogt. All rights reserved. Knape & Vogt
,measure 1/2" to 3/4" back from
A
A
®
reserves the right to change specifi cations without notice. Made in USA.
Top View
BIN
BIN
BIN
Overall Cabinet
Width: 18"
310172-0609