Allen + Roth BROOKES 21-B45WDCP-AR Manual Del Usuario página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS (Continued)
5.
Attach one end of each of the water supply lines onto the water
inlet tubes (5.1) on the handle assemblies (B, C), with hot water
on the left and cold water on the right. Use 1/2 in. IPS faucet
connections (5.2) or supply line coupling nuts (5.3) with 3/8 in.
OD ball-nose risers (5.4). NOTE: Do not reuse existing supply
lines. When installing new water supply lines, please refer to the
supply line manufacturer's installation instructions. Tighten the
supply line connections using an adjustable or basin wrench. Do
not overtighten.
Attach each of the remaining ends of the water supply lines to the
hot and cold shut-off valves (5.5) and tighten with a wrench. Do
not overtighten.
6.
Remove the old pop-up drain assembly. Clean all sink surfaces
to remove old putty and dirt before installing the new drain
assembly. Remove the flange and upper threaded portion (6.1)
of the pop-up drain assembly from the bottom gasket (6.2),
mounting nut (6.3) and the lower portion of the pop-up drain
assembly (D).
7.
Insert the flange and upper portion of the pop-up drain assembly
(7.1) into the sink hole (7.2).
8.
From underneath the sink, attach the rubber gasket (8.1)
and mounting nut (8.2) onto the upper portion of the pop-up
drain assembly (8.3). Then twist the bottom of the pop-up
drain assembly (D) onto the upper portion of the pop-up drain
assembly (8.3) and hand tighten. Do not overtighten.
5
5
5.1
5.4
5.2
5.3
5.5
6
6.1
6.2
6.3
7
7.1
7.2
8
8.3
8.1
8.2
D
D

Publicidad

Tabla de contenido
loading

Tabla de contenido