INSTALLATION INSTRUCTIONS
3. Secure drain pipe (not included) per drain
manufacturer's instructions.
4. Place the shower base (A) in studded
alcove. Level base with shims into
construction adhesive under feet. After
base is leveled, if alcove is larger than
base, shim between base and studs to
create tight fit.
5. Check again that all sides are level.
Front apron should be firmly on the floor.
If floor leveling compound was not used,
then the feet of the shower base (A)
should be gluded to the subfloor. Shims
(if used) should be secured to the floor
and the feet.
3
Waste Pipe
4
5
6
A
A
Shims
A