INSTALLATION INSTRUCTIONS U-HANDLE KIT
15. Route throttle linkage and ignition lead assembly behind U-Handle
bracket and clip to drive shaft as shown.
16. Place inner throttle cable in large hole of carburetor swivel (D).
17. Loosen nut (C) and place threaded end of throttle linkage in
bracket slot. Finger tighten nut (C).
18. Check throttle for freedom of movement and that wide open
throttle / low idle extremes are adjusted properly. If adjustment
cannot be achieved with adjusting nut (C), consult with your Echo
Dealer for correct adjustment procedure. Tighten nut (C).
19. Install air filter and cover.
20. Connect 2 ignition stop leads (A,B) from throttle cable tubing to 2
ignition leads (A,B) on engine.
21. Balance unit.
a. Put on harness and attach unit to harness.
b. Slide harness clamp (L) up or down until unit balances with
cutting attachment approximately 2" - 3" from the ground.
c. Tighten harness clamp screw.
B
3
D
L