2 - UK
GENERAL INSTALLATION INSTRUCTIONS
•
Store the material indoors.
•
Check the parts for completeness and possible damage.
•
Only combine the system with components from M&G Group members.
•
Only use original fasteners and make sure they are properly tightened.
•
Make sure that the intermediate box and top box are installed level.
•
Install according to national regulations.
•
The location of the chimney must comply with NEN 2757 and comply with CPR, building regulations.
•
For additional regulations, see the installation regulations of Burgerhout or M&G Group.
•
Check building construction for load. Weight of the Delta-Discovery Air is 100 kg, max total weight is
240 kg.
•
Prevent guttering.
Maximum dimensions of the heat pump
!
(incl. support feet).
410mm
850mm
Only the front and rear panel from the
!
top box may be removed on the roof.
1/4
CLEANING
Advice: Remove leaves from the top box every year to prevent blockage of the condensation drain.
Clean any dirt from the exterior using a cloth dampened with water and a small amount of detergent if
necessary.
We reserve the right to correct print errors or make technical changes. In case of doubts ask M&G Group
for advice.
!
1000mm
!
Check if the angles of the roof and the
covering piece are matching.
α
α
Only use the lifting eyes for lifting the
top box.
4x